The Pier Park Target is getting ready for the coming Wal Mart competition by adding to their rather lame food section. They will add meat, fresh produce and a larger selection of those items already carried.
They are also getting a general remodeling after being open for only 4 ½ years. The work consists of painting, new isle layouts and redone end cap designs. All this should be done by mid-March, just in time for the Spring Break crowd.
The coming, 156,000-square-foot Wal Mart will be located just across Powell Adams Rd from this Target and its construction will start this spring with completion a year after that.
Of benefit to both stores is an addition of a traffic light at Powell Adams and PCB Parkway the street will have 4 lanes south from PCB Pky (aka: Back Beach Rd) to about halfway to Front Beach Road. The cost will be approx 1.9 million paid initially by Wal Mart and they will be reimbursed 1.54 million by the Community Redevelopment Agency.

Read more:
http://www.newsherald.com/articles/pcb-97715-spring-walmart.html#ixzz1bB5kPfQY
They are also getting a general remodeling after being open for only 4 ½ years. The work consists of painting, new isle layouts and redone end cap designs. All this should be done by mid-March, just in time for the Spring Break crowd.
The coming, 156,000-square-foot Wal Mart will be located just across Powell Adams Rd from this Target and its construction will start this spring with completion a year after that.
Of benefit to both stores is an addition of a traffic light at Powell Adams and PCB Parkway the street will have 4 lanes south from PCB Pky (aka: Back Beach Rd) to about halfway to Front Beach Road. The cost will be approx 1.9 million paid initially by Wal Mart and they will be reimbursed 1.54 million by the Community Redevelopment Agency.
http://www.newsherald.com/articles/pcb-97715-spring-walmart.html#ixzz1bB5kPfQY
